Civil Engineering Basic Knowledge
LOAD TEST
Load test r somoy pile r upor load dita hoba:
Service pile r khatra = Design Load x 1.5 =169x1.5 (ton)
Test pile r khatra = As per Design
N:B - design load (169 Ton) (See the picture marking area)
Important For CI Sheet Calculation.
* 6' CI Sheet has 12 nos in a Bundle.
** 8' CI Sheet has 9 nos in a Bundle.
* 7' CI Sheet has 10 nos in a Bundle.
* 9' CI Sheet has 8 nos in a Bundle.
* 10' CI Sheet has 7 nos in a Bundle.
*CI Sheet Overlapping = 1'
*CI Sheet width = 2.5'
Example: From Calculator you get 104.94 cft for long wall.Then How much CI Sheet Require For
upward size (Variant).
Solution: Here I Take 6' CI Sheet.
Then, 104.94/2 ( We take 2 cause of overlapping) =52.47 Rft
Again, 52.47/6 = 8.74 nos say 9 nos
WHAT IS FARA?WHAT IS THE MEASUREMENT OF FARA?
For The Accurate Measurement Of Cement , Sand And Khoa We use Fara.We know 1 bag cement = 1.25 cft.So the fara ‘s measurement should be 1.25 cft.The Fara’s Dimension is length=1ft,width=1ft and height=15inch.So (12x12x15)/(12x12x12)=1.25cft.So 1 Fara = 1 bag Cement.Measure how much Tukri khoa = 1 fara there’s u get khoa’s amount,then we know 1/2 of khoa = sand.So if we say 1:2:4 Ratio Casting we can easily calculate the materials amount.1=cement 2=sand 4= khoa dts all.